SWPPP Requirements in Indiana

Indiana regulates construction stormwater under the Construction Stormwater General Permit (CSGP; NPDES INRA00000) authorized in 327 IAC 15-5 and administered by IDEM. All projects disturbing 1+ acre must obtain coverage by filing an NOI via IDEM's Regulatory ePortal (MyIDEM). A SWPPP must be developed and implemented before earth disturbance begins.

Data Note: This page contains general guidance for Indiana. We are actively verifying state-specific details. Last reviewed: 2026-04-10. Contact a local consultant for current requirements.

Indiana SWPPP Key Facts

  • CSGP (INRA00000) under 327 IAC 15-5 is Indiana's statewide construction stormwater general permit
  • NOI filed through MyIDEM online portal — paper submissions not accepted
  • SWPPP must be on site and available for IDEM inspection at all times
  • $0 NOI fee
  • Common plan of development aggregation applies statewide

Administering Agency

Agency
Indiana Department of Environmental Management (IDEM)
Phone
317-232-8160
Email
stormwater@idem.in.gov

Permit Details

Permit Name
Construction Stormwater General Permit (CSGP; 327 IAC 15-5)
Permit Number
INRA00000
Effective Date
2021-12-18
Expiration Date
2026-12-17
Permit Document
View Current Permit

SWPPP Thresholds & Triggers

Acreage Threshold
1 acre of land disturbance

CSGP coverage is authorized under 327 IAC 15-5. Projects in regulated MS4 jurisdictions may have additional local requirements. Common plan of development provisions aggregate smaller parcels.

Inspection Requirements

Inspection Frequency
At least once every 7 days and within 24 hours after a rainfall event of 0.5 inches or more
Rain Event Threshold
0.5 inches in 24 hours
Certified Inspector
Required by state
Accepted Certifications
CPESC, CESSWI, IDEM-recognized Storm Water Inspector

NOI must be filed through IDEM's MyIDEM online portal. Construction cannot begin until NOI is processed.

Penalties & Enforcement

Max Civil Penalty (Per Day)
$25,000 per day per violation
Criminal Penalties
Class D felony for knowing violations causing significant harm

IDEM field inspectors conduct site visits; complaint-driven inspections are common.

Permit Fees

NOI Filing Fee
$0
Other Fees
Local MS4 fees may apply in Indianapolis, Fort Wayne, and other regulated communities

How Indiana Differs from Federal Requirements

  • Indiana administers its own CSGP (INRA00000) under 327 IAC 15-5 rather than EPA's federal CGP.
  • MyIDEM online filing is mandatory; no paper NOI option.
  • The CSGP includes Indiana-specific BMP design standards that may differ from EPA CGP appendices.

SWPPP Tips for Indiana

  • Submit your NOI through MyIDEM well before the planned start date — IDEM processes NOIs in order received.
  • The CSGP requires the SWPPP to be updated when site conditions change; document all amendments.
  • In regulated MS4 communities (Indianapolis, Fort Wayne), verify local stormwater ordinance requirements before NOI submission.

Indiana SWPPP FAQs

What is Rule 5 in Indiana?+

Administrative rule 327 IAC 15-5 authorizes IDEM's Construction Stormwater General Permit (INRA00000). It establishes NOI, SWPPP, BMP, and inspection requirements for projects disturbing 1+ acre.

Can construction begin before IDEM processes the NOI?+

No. Indiana's CSGP (327 IAC 15-5) requires that NOI coverage be confirmed before any land disturbance begins. IDEM will notify the applicant when coverage is granted.

Find a SWPPP Consultant in Indiana

Tell us about your project and we'll connect you with a qualified environmental consultant — free, no obligation.

We'll only call if you ask us to.

Free, no-obligation match. Your info is kept confidential.