Illinois administers NPDES construction stormwater coverage under permit ILR100000 through IEPA. The 1-acre threshold applies statewide. The Chicago metropolitan area is one of the most complex construction stormwater environments in the US — Cook County and the Metropolitan Water Reclamation District (MWRD) impose overlapping requirements. Illinois has a large construction market with high NOI volume processed through IEPA's e-permitting system.

Data Note: This page contains general guidance for Illinois. We are actively verifying state-specific details. Last reviewed: 2026-04-10. Contact a local consultant for current requirements.

Illinois SWPPP Key Facts

  • Permit ILR100000 — statewide NPDES construction general permit
  • Chicago metro MS4 complexity: 6-county overlay with MWRD jurisdiction
  • IEPA e-permitting mandatory for NOI submission
  • $0 NOI fee statewide
  • Illinois has one of the highest construction stormwater permit volumes in the Midwest

Administering Agency

Agency
Illinois Environmental Protection Agency (IEPA)
Phone
217-782-3362

Permit Details

Permit Name
Illinois NPDES Construction Site Stormwater Runoff General Permit
Permit Number
ILR100000
Effective Date
2014-03-01
Permit Document
View Current Permit

SWPPP Thresholds & Triggers

Acreage Threshold
1 acre of land disturbance

Chicago metro MS4 communities (Cook, DuPage, Kane, Lake, McHenry, Will counties) impose additional local stormwater requirements. Projects near Illinois waterways may require IDNR coordination.

Inspection Requirements

Inspection Frequency
At least once every 7 days and within 24 hours after a 0.5-inch or greater rain event
Rain Event Threshold
0.5 inches in 24 hours
Certified Inspector
Required by state
Accepted Certifications
CPESC, CESSWI, IEPA-recognized inspector

IEPA online NOI system (e-permitting) is the required submission method. Large construction market — IEPA processes high NOI volumes.

Penalties & Enforcement

Max Civil Penalty (Per Day)
$50,000 per day per violation
Criminal Penalties
Class 4 felony for knowing violations; fines up to $50,000/day

IEPA and Illinois Attorney General can pursue enforcement; Chicago metro has active enforcement programs.

Permit Fees

NOI Filing Fee
$0
Other Fees
Chicago metro MS4 stormwater fees vary by municipality; MWRD may impose additional requirements

How Illinois Differs from Federal Requirements

  • Illinois administers its own ILR100000 permit rather than EPA's federal CGP.
  • MWRD and Chicago-area MS4 requirements add a local layer with no direct federal equivalent.
  • Illinois maximum civil penalty ($50,000/day) exceeds the standard federal CGP penalty ceiling.

SWPPP Tips for Illinois

  • In Cook County, contact the MWRD and local MS4 before filing — local ordinances may impose stricter BMP requirements than ILR100000.
  • IEPA e-permitting system can have processing delays during peak construction season (spring); submit early.
  • Document all SWPPP amendments carefully — Illinois inspectors verify amendment logs during site visits.

Illinois SWPPP FAQs

Does Illinois require a permit for projects under 1 acre?+

No state ILR100000 coverage required under 1 acre unless part of a larger common plan of development. However, Chicago-area MS4 communities may impose local requirements for smaller sites.

What role does MWRD play in construction stormwater in Chicago?+

The Metropolitan Water Reclamation District of Greater Chicago is a regional wastewater and stormwater authority. Projects in its service area may need to comply with MWRD retention/detention standards in addition to ILR100000.

Find a SWPPP Consultant in Illinois

Tell us about your project and we'll connect you with a qualified environmental consultant — free, no obligation.

We'll only call if you ask us to.

Free, no-obligation match. Your info is kept confidential.